Oregon 42: Lookingglass Creek to I-5 (Winston)

Design Phase

Region 3: Southwestern Oregon (Winston, Douglas)


​​​​​​​​​​​​​​The project will resurface a five-mile section of Oregon 42 between Winston and Interstate 5, install a new traffic signal at Rolling Hills Road, add safety features to help reduce crashes through the Green District, and upgrade sidewalk curb ramps to better accommodate wheelchair users and other pedestrians.​


Impacts

Meetings and Events

ODOT held a public open house for this project at Winston Middle School on Nov. 15, 2023, and more than 50 people attended. The Open House materials were posted on this web page a week before the live open house. The displays and slideshow are still available online, though some parts of the project design have changed.

Results of public comment


During the open house public comment period (Nov. 1 to Dec. 15, 2022), ODOT received 30 comment cards, several emails and phone calls. After reviewing the comments, ODOT has decided to make four changes to the project:

  1. Left-turn movements will continue to be allowed between Oregon 42 and Winery Lane. ODOT had originally planned to restrict left-turns at this location.
  2. Since left-turns will be allowed at Winery Lane, U-turn accommodations will no longer be needed for westbound Oregon 42 traffic at Carnes Road or eastbound highway traffic at Grant Smith Road.
  3. Right-turn lanes will be provided for westbound Oregon 42 at Landers Avenue and Rolling Hills Road. These turn lanes will help prevent rear-end crashes.
  4. Streetlights will be added near the intersection of Oregon 42 and Landers Avenue and Jackie Avenue. 

ODOT has compiled a 10-page document that summarizes the public comments we received and provides our response: Results from public comment period.

We at ODOT want to thank everyone who participated in this process. We believe we make the best decisions when we work in partnership with local communities and individuals.

Questions: If you have any questions or if you would like to discuss the project, feel free to call or e-mail Dan Latham​ at 541-817-5200.


Details

About

​The project will resurface Oregon 42 from Winston to Interstate 5, repair five bridges, make several traffic safety improvements and upgrade pedestrian curb ramps.

Project map


​What is the problem?​


The three-mile area of Oregon 42 between the South Umpqua River and Interstate 5 has seen several serious crashes in recent years, some involving fatalities. Many of these crashes involve turning movements or vehicles departing their lane of travel.

Pedestrian facilities do not meet Americans with Disabilities Act standards. Sidewalks and curb ramps can be difficult for wheelchair users to navigate.

The four-mile area of Oregon 42 between Lookingglass Creek and Grant Smith Road was last paved nearly 20 years ago. The pavement shows extensive surface wear and cracking, and the travel lanes are rutted in several areas. Most of the bridges along this stretch of highway are in need of maintenance and resurfacing.

What does ODOT plan to do?


This project will include features to improve safety and reduce crashes between the South Umpqua River and Interstate 5.

  • A new traffic signal will be installed on Oregon 42 at Rolling Hills Road/Grange Road. The signal will include streetlights, crosswalks and dedicated left-turn lanes in both directions of Oregon 42.
  • Turn restrictions: Channelizing islands and median barrier will be installed along Oregon 42 between Rolling Hills Road and Carnes Road. The islands and barriers will limit left-turn movements to fewer intersections, helping to reduce crashes involving turn movements and lane departures.
  • U-turns: Due to the new turn restrictions, U-turn accommodations will be provided for Oregon 42 motorists at two signalized intersections, Rolling Hills Road (westbound to eastbound) and Roberts Creek Road/Carnes Road (eastbound to westbound). The U-turn accommodations will allow travel between both directions of Oregon 42 and the neighborhoods north of the highway.
  • New streetlights: Additional illumination will be provided along the multiuse path near the Oregon 42 intersections at Landers Avenue and Jackie Avenue.
  • Crossover crashes: Raised concrete barrier will be placed along the center median of Oregon 42 between Grant Smith Road and the northbound I-5 ramps. This will help prevent head-on collisions.
  • Approaching on-ramp: The striping on Oregon 42 eastbound will be adjusted at Exit 119 so that the left lane drops and traffic merges to the right. This is expected to help ease the lane imbalance as Oregon 42 traffic approaches the northbound on-ramp.
  • Right-turn lanes will be provided for westbound Oregon 42 at Landers Avenue and Rolling Hills Road. This will reduce the risk of rear-end collisions by allowing vehicles to exit the highway travel lanes before turning.
  • Curb ramps: Pedestrian facility improvements will involve replacing ADA curb ramps at 14 intersections along Oregon 42 between Main Street (the Cheetah intersection) and Grant Smith Road.
  • Paving work will begin at Lookingglass Creek and continue to I-5. Most of this area will receive a 2-inch grind and inlay. Intersections that are more damaged or rutted will receive a 4-inch grind/inlay. The half-mile area between Grant Smith Road and the northbound I-5 ramps will also be resurfaced due to striping changes and median installation.
  • Bridge repairs: As part of the resurfacing work, several bridges within the project area will receive new expansion joints, deck seals and overlays.
  • Traffic signal improvements: ODOT will install new hardware on the Oregon 42 traffic signals at Grant Smith Road, Carnes Road (Kelly’s Corner), Rolling Hills Road and the Oregon 42/Oregon 99 junction (Cheetah intersection) to help reduce rear-end crashes and improve safety at these intersections.


Barrier graphic

Which intersections will be affected by the median barrier?


All turning movements will be allowed at the three signalized Oregon 42 intersections in the Green District (Rolling Hills/Grange, Carnes/Roberts Creek and Old Hwy 99 S/Grant Smith). Left and right turns will also be allowed at Art Mill Lane and Winery Lane.

The introduction of channelizing islands and center median barrier along Oregon 42 will reduce the number of left-turn opportunities between Rolling Hills Road and Carnes Road. Right turns will continue to be available at all intersections. (See barrier graphic)

  • Heatherwood Lane: No left turns in or out will be allowed. Right in and out only.
  • Jackie Avenue: No left turns in or out will be allowed. Right in and out only.
  • Landers Avenue: Eastbound Oregon 42 traffic may turn left into Landers Avenue. Left turns onto eastbound Oregon 42 will not be allowed. Right out only.
  • Emils Way/Grange Road: Left turn lanes will be provided for eastbound and westbound Oregon 42 onto Emils Way and Grange Road at this intersection. However, left turns from from the side streets onto the highway will not be allowed.

Since the new median and channelizing islands will prevent motorists on side streets from turning left onto Oregon 42, ODOT will provide U-turn accommodations at Rolling Hills/Grange Road (westbound to eastbound) and at Carnes/Roberts Creek Road (eastbound to westbound).

What curb ramps will be replaced?


This project will replace ADA sidewalk curb ramps at 14 intersections (from east to west) along Oregon 42: Douglas & Main Street (the Cheetah intersection), Baker Street, Jorgen Street, Sherry Street, Brosi Orchard Road, Lookingglass Road, Helwig Road, Rolling Hills/Grange Road, Heatherwood Lane, Jackie Avenue, Landers Road, Emils Way, Carnes/Roberts Creek Road, and Old Highway 99 South/Grant Smith Road. All new curb ramps are designed to meet ADA standards.

Project Schedule


The bid let date is tentatively scheduled for Oct. 31, 2024.

Construction is estimated to take place between January 2025 and December 2026. This timeline will be adjusted when the design is finalized.

Location

OR 42 |

​Oregon 42 (Milepost 72.5-77.0), City of Winston, Green District (Douglas County)

Cost and Funding

​$17.8 million in funding has been approved for this project (estimate, Statewide Transportation Improvement Program)


Additional Information

Project updates: ODOT will notify the public prior to any road closures or other major traffic impacts. Visit our GovDelivery page to sign up for project e-mail updates.

Southwest Oregon projects: Learn about other ODOT projects​ in Coos, Curry, Douglas, Josephine and Jackson counties.

Contacts & Media

Project location

Image Gallery

Project Contact

Public Information Officer
Dan Latham
Email
Dan.Latham@odot.oregon.gov
Phone
541-817-5200

Get Project Alerts

Sign up for the newsletter! https://www.facebook.com/OregonDOT

Last Updated

1/24/2024 4:01 PM

Project Number

21677

Project Documents

Related documents to this project
R3-Winston42-MAP.jpgMap of project area (June 26, 2023)
R3-Winston42-EMP-2013.pdfOR 42 Expressway Management Plan (August 2013)
R3-Winston42-OH-DISPLAYS.pdfOpen House displays (November 2022)
R3-Winston42-OH-SLIDES.pdfOpen House slideshow (November 2022)
R3-Winston42-BARRIER.pdfGraphic for highway median barrier in Green District (June 26, 2023)
R3-Winston42-INFO.pdfProject information sheet (June 26, 2023)
R3-Winston42-OH-RESULTS.pdfResults from public comment period (June 26, 2023)